He we have the final episode of painting the miniature MODELU O gauge, 7mm scale figures for the layout.
These figures are excellent, and can be seen in the photo montage that they do make a big difference to the layout
The layout itself is a semi scale representation of the former steam shed, which became a diesel depot at the end of steam on the south eastern division under the BR modernisation scheme, and is depicted around 1989-91 era when the depot was managed by trainload freight south east, and the predominant sector in the area being construction, especially utilised for the traffic for construction of the channel tunnel.
This part of the depot was bulldozed in the mid 1990’s